Savelyeva Yana Igorevna

Savelyeva Yana Igorevna

Architecture, design, engineering

10

Reviews (0)

Leave feedback

Key data

AGE

37 years

LOCATION

Saint Petersburg, Russia

ABOUT

Experience in the design of facilities for various purposes - more than 10 years; development of design documentation for sections of TS/GSN in full (stages "PD", "RD").

Specialization and skills

Specialization

Gas supply engineer (GSN, GSV, AGSV)

Development of sections of TS/GSN
Interaction with contractors
Assignment of tasks to related sections
Passing the examination
Coordination
AutoCad
"START"
Pipeline 2012
Zulu design calculation

Conditions of work

STATUS

Flexible schedule

Employment

Distant work,

Part-time employment

Agreement

Experience — 12 years

Engineer of the educational and methodological department в SPb GTU RP

February 2009 — March 2010

- issuing orders and instructions for the correspondence faculty; - operational work with the electronic database of student body; - maintaining current documentation of the dean's office.

Lead Engineer в JSC "InkomProekt"

March 2010 — May 2012

- development of projects for reconstruction of intra-block heating networks, heat supply of civil engineering and civil engineering facilities, removal of heating networks beyond the boundaries of designed highways; - performance of hydraulic calculations; - development of text and graphic documentation (plans, installation diagrams, profiles, sections, heat chambers, units) for heating networks; - calculation of loads on fixed supports in the START program; - preparation of a list of work volumes and specifications for heating networks; - coordination of projects, removal of comments from the customer and state examination.

Lead Engineer в Peterpipe Engineering LLC

May 2012 — July 2012

- development of sections TS, ODK, POS, POD, KZh as part of the project for reconstruction of heating networks; - calculation of loads on fixed supports in the START program.

Design Engineer 2nd category в OOO "TEP SPb"

October 2012 — September 2013

- development of drawings (plan, installation diagram, heat chambers, longitudinal profile, input units, sections) and text documentation (PP, statements and specifications) for the section "Thermal-mechanical solutions for heating networks"; - development of the section "Temporary heating network"; - development of the sections OPZ, POD, PPO, PB as part of the heating network reconstruction project; - removal of comments from GUP "TEK SPb" and related organizations (Rostelecom, Cable Networks, Petersburggaz, Vodokanal), removal of comments from the state examination.

Team Leader в JSC "Lenpromtransproekt"

September 2013 — December 2015

- analysis of initial data, setting tasks and monitoring the design of objects - conducting a full range of calculations - development of projects for the reconstruction of intra-quarter heating networks of the State Unitary Enterprise "TEK SPb" - development of sections of external heating networks for PGS objects - projects for the removal of existing heating networks beyond the boundaries of the designed highways and railways - verification of TS projects for compliance with regulatory and technical documentation

Lead Design Engineer в LLC "SMU-303 Engineering"

February 2016 — May 2018

- development of the "Heat networks" section in full (facilities located in areas with seismicity of 9 points, in areas with complex terrain, in areas of children's and medical institutions, in cramped urban conditions, main heat networks with a diameter of up to 700 mm) - carrying out the necessary calculations, selecting equipment, drawing up a list of volumes of work and specifications

Chief Project Engineer в OOO "Stroymodul"

May 2018 — January 2020

- drawing up calendar schedules of works, coordination with the Customer - request for initial data for development of design and working documentation - drawing up technical specifications for development of related sections, quality control and design deadlines, linking sections - coordination of network construction projects with owners of existing and designed communications, owners of land plots, district Administration, KGIOP, USPKh, OPS KGA, expert bodies - transfer of documentation to the Customer - work with St. Petersburg State Institution "Customer Management" and State Unitary Enterprise "TEK SPb"

GSN design engineer в LLC "StroyGazKomplekt"

February 2020 — March 2021

- development of sections of PZ, PPO, TKR for external medium and low pressure gas pipelines made of PE pipes - calculation of specifications - design of reconstruction of GRPB from connection points to the entry point into GRPB - axonometric diagrams of existing PURG and GRPSh equipment

Leading Engineer for Heating Networks в LLC "ZapSibGazprom-Gazification"

June 2021 — till now

- development of PD and RD for the section "Heat networks" - assistance to the customer in compiling a package of initial data for the development of the TS section - preparation of tasks for related sections (NVK, KZh) - implementation of incoming control of contractors performing the TS section, preparation of comments, control over the processing of comments

Education

Higher education

Russia

Industrial thermal power plants and heat supply systems в SPb GTU RP

September 2005 — July 2010